Louisville Medical Center

WM Group's 20-year vision for growth at Louisville Medical Center has resulted in a 50 percent reduction in the unit cost of chilled water while total campus production has tripled.

Massachusetts Institute of Technology

A simple operational modification at MIT improved their chiller efficiency by 20 percent.

Check out energy- and money-saving results

Here are case studies that showcase our ‘smart solutions' in different practice areas and markets. We've applied our mechanical engineering expertise to a wide range of projects - from optimizing chilled-water systems and delta T to upgrading steam distribution networks, providing peer review and operations advice, and more.

Case Studies - WM Group

From designing a chilled-water system for the new World Trade Center to expanding the central power plant at Yale University, WM Group has optimized the performance of some of the most high-profile, technically challenging building facilities in the U.S. and abroad.

Read these case studies for a more in-depth look at how our ‘smart solutions' have delivered the energy- and money-saving results our clients were looking for.